Thursday, April 5, 2012

Day 27 - Onto the 2nd floor.


Stopped by around 6pm and they had the entire first floor done, and the floor joists for the 2nd floor were going up.    

Very impressed with the framing crew so far.  Might have to swing by on the way to work with some donuts or something...

First Floor Front
3 Car Side Entry Garage
Morning room and 3 LR windows. 

2 comments:

  1. Love the three living room windows across the back. You'll have so much natural light!

    ReplyDelete
    Replies
    1. The middle one was an add-on but the morning room came with 4. 7 across the back + a patio door should be plenty of light.

      Delete